On the back of a successful design of a battery charging facility at a training camp in north of England, we have now been commissioned to design a further 3 more installations at MOD training camps in the north and north west of England.
Humphrey designed the CompEx compliant installation for the battery charging facility including ATEX rated electrical and ventilation equipment together with the bespoke ventilated shelving systems.